
Analysis · Private networks · part 4 of 5
The rules that decide the shared band
In August 2024 the FCC opened the CBRS rules to change, and in the two years since it has decided nothing. The carriers, meanwhile, have asked either for 15 dB more power or for the band itself. A statute passed in 2025 closed off the band AT&T had proposed as a new home for CBRS users, while leaving CBRS in the auction pipeline. Over the same period the FCC widened the other shared band, 6 GHz, once again.
Sources: The notice FCC 24-86 (GN Docket 17-258) and DA 24-1009, DA 24-1103 and DA 25-963; the ECFS docket listing to 7 Oct 2026 and the filings of AT&T, Verizon, T-Mobile, CTIA, OnGo Alliance and APM Terminals (5 Dec 2024), CTIA (9 Feb 2026), CCA (10 Apr 2026), Syracuse University (14 Jul 2026), the CBRS coalition (15 Jul 2026) and WISPA (6 Oct 2026); the Luján and Fischer letter (6 Mar 2026); P.L. 119-21, section 40002; FCC 26-46; the FCC’s 6 GHz news release of 29 Jan 2026, fact sheet and Federal Register text; 47 CFR § 96.41 and § 90.219; the FirstNet Authority’s FY2025 report; Broadband Breakfast on the Chairman’s office (6 May 2026); Fierce Network on the power study (8 May 2026) and Critical Communications Review on the same study (16 Apr 2026) and on earlier proposals (13 Apr 2021); Light Reading on the December 2025 letters. Retrieved 7 Oct 2026.
The notice of August 2024 has produced no order in more than two years
FCC 24-86, adopted on 5 August 2024 and released on the 16th, opened the CBRS rules to change. The replies came in that December, and since then the docket has filled with letters and produced no order (Exhibit 1).
Most of the notice is housekeeping. It proposes to write into Part 96 the federal protections that part 1 describes as resting on notices: the Dynamic Protection Areas, the portal through which the Defense Department switches them on, and permanent protection around eleven ground radar sites. It also covers emission limits, database outages and synchronisation. The argument lives in two paragraphs. Paragraph 53 asks “whether to add one or more classes of higher power CBSDs”. Paragraph 78 asks whether some GAA spectrum should be set aside for private, low-power indoor networks, an idea the Commission turned down in 2015. The notice’s own baseline for the band was more than 370,000 radios and more than 750 certified end-user devices.
Source: FCC 24-86, DA 24-643, DA 24-1009, DA 24-1103, DA 25-963; ECFS listing of GN Docket 17-258 to 7 October 2026 and the filings named; P.L. 119-21; FCC 26-46 (Filed); Light Reading on the December 2025 letters (Reported). Note: since the notice, the FCC’s own documents in the docket are the order extending the comment dates (DA 24-1009, 27 September 2024) and two annual reminders to satellite earth stations (DA 24-1103, 25 October 2024, and DA 25-963, 20 November 2025).
The carriers want more power or the band itself
The carriers’ positions are on file, and they differ (Exhibit 2). AT&T’s reply asked the FCC to relocate CBRS users to 3.1 to 3.3 GHz “through an innovative incentive auction”, which would clear “150 MHz for full power, exclusively-licensed deployments”: a request for the band itself. Verizon asked for less: a new Category C radio at 62 dBm per 10 MHz, and phones at 26 dBm. T-Mobile asked for usage data first and warned that changes to power and emissions “may well require relicensing the band”. By February 2026 two of the three, with their trade association, had a wider proposal. CTIA, with T-Mobile and Verizon, told the Chairman’s office that the band lies between the 3.45 GHz band and the C-band. “The Commission has a real opportunity to build a 700+ megahertz contiguous superhighway in the best part of mid-band”, they said.
| Party | Position | Filed |
|---|---|---|
| AT&T | Move CBRS users to 3.1 to 3.3 GHz; auction 3.55 to 3.7 GHz at full power | 5 Dec 2024 |
| Verizon | New Category C at 62 dBm/10 MHz; phones at 26 dBm; no GAA set-asides | 5 Dec 2024 |
| T-Mobile | Usage data first; changes may require relicensing | 5 Dec 2024 |
| CTIA, T-Mobile, Verizon | A “700+ megahertz contiguous superhighway” through the band | 9 Feb 2026 |
| Rural carriers (CCA) | Higher power where feasible; warns of churn if the band is reorganised | 10 Apr 2026 |
| CBRS coalition, with John Deere | Act on the “non-contentious” CBRS 2.0 changes; its attached OnGo paper opposes higher outdoor power | 15 Jul 2026 |
| Syracuse University | Against higher power; full deployment on hold until the rules settle | 14 Jul 2026 |
| APM Terminals | Codify the 2024 changes, which “greatly improved our experience” | 5 Dec 2024 |
| Senators Luján and Fischer | Keep current rules and power levels | 6 Mar 2026 |
Each position is quoted or summarised from the party’s own filing in GN Docket 17-258, except the senators’, whose position is their letter to the FCC.
Source: ECFS, GN Docket 17-258: replies of 5 December 2024; ex partes of 9 February, 10 April and 15 July 2026; letter of 14 July 2026 (Filed); letter of Senators Luján and Fischer to the FCC, 6 March 2026.
Verizon’s proposed class is one building class of loss
Today’s ceilings are 30 dBm per 10 MHz for a Category A radio, which is a watt, and 47 dBm for a Category B radio, which is about 50 W. Verizon’s 62 dBm is 15 dB above Category B, and since every 10 dB is a factor of ten in power, that comes to about 32 times. The 72 dBm Category D that DISH proposed in 2021 would be 25 dB above, about 316 times. Brownsville’s waiver request, at 60 dBm, is 13 dB above, about 20 times (Exhibit 3).
Source: 47 CFR § 96.41(b); Verizon reply, 5 December 2024; WISPA ex parte, 6 October 2026 (Filed); DISH’s 2021 proposal as reported by Fierce Network, 13 April 2021 (Reported); ratios calculated by Blue Prysm (Calculated). Note: the scale is logarithmic, so equal steps are equal multiples of power. Above Category B, 13 dB is about 20 times the power, 15 dB about 32 times and 25 dB about 316 times.
The figure of 62 dBm has a physical meaning, which part 3 supplies. Fifteen decibels is the gap between a traditional building and a thermally efficient one at 3.625 GHz, so the proposed class would hand a radio outside the building back roughly one building class of loss. The carriers’ case rests on that, and it is coherent. The users’ case is that the same 15 dB lands on everyone sharing the channel. Valo Analytica studied the question for the advocacy group Spectrum for the Future, with the database operator Key Bridge as technical partner, and found that converting fewer than 2% of CBRS base stations to high power would cause a massive loss of throughput, as Fierce Network reported. Syracuse University put it to the FCC as a “tragedy of the commons”. The Chairman’s office has a question of its own: his adviser, Arpan Sura, said in February 2026 that he wanted to examine whether the more than 400,000 radios in the band are a good indicator of use, as reported.
Verizon’s proposed class is one building class of loss: 15 dB above today’s ceiling, the same 15 dB that separates the two kinds of building. Higher power is in substance a proposal to serve buildings from outside. The indoor and low-power networks that share the channel say they would pay for it in interference, and a shared channel leaves little room for any other outcome.
The statute left CBRS inside the auction pipeline
P.L. 119-21, signed on 4 July 2025, gave the FCC its auction authority back and set a pipeline of 800 MHz to be found between 1.3 and 10.5 GHz. The 6G series sets out its deadlines; what matters here is which bands it protects.
Only two ranges are written out of the pipeline, 3.1 to 3.45 GHz and 7.4 to 8.4 GHz, each “for purposes of auction, reallocation, modification, or withdrawal”. Two consequences follow for the shared bands (Exhibit 4). First, AT&T’s proposed home for CBRS users, 3.1 to 3.3 GHz, is now a band the statute bars from that kind of change. Second, 3.55 to 3.7 GHz is inside the covered band and nothing excludes it; the same applies to 5.925 to 7.125 GHz.
The FCC’s own obligation is to auction 300 MHz, and the statute names no band for it beyond 100 MHz of upper C-band. Its first order, FCC 26-46 of 22 July 2026, takes 160 MHz there, which leaves at least 140 MHz still to find by 30 September 2034. NTIA’s first 200 MHz of federal spectrum is due on 4 July 2027. Neither the statute nor anything on the record says whether the shared 3.55 to 3.65 GHz counts as “allocated for Federal use” for that purpose.
YesNo
Source: P.L. 119-21, section 40002, 139 Stat. 128; FCC 26-46, 22 July 2026, paragraph 73; FCC 26-1, 29 January 2026 (Filed). Note: the covered band is 1.3 to 10.5 GHz, and 7.4 to 8.4 GHz is the other exclusion. The statute requires at least 100 MHz of 3.98 to 4.2 GHz to be auctioned by July 2027; the FCC chose 3.98 to 4.14 GHz. No FCC or NTIA proposal to auction any part of CBRS or 6 GHz was found on the record.
The same order touches CBRS directly. It raised the power limit for phones across 3.7 to 4.14 GHz, the band immediately above CBRS, from 1 W to 2 W. The Commission chose 2 W “out of an abundance of caution”, against the 4 W that AT&T, Verizon, CTIA and Qualcomm had asked for. The CBRS users had asked for the change to wait for coexistence studies, and the order replied that they “have not outlined detailed concerns with, or presented any specific analysis of, the potential impacts on CBRS operations”. For anyone arguing the power case in the main docket, that sentence is the lesson.
The statute closed the route AT&T proposed for moving CBRS users and left the band itself unprotected. The FCC’s first order under it raised power at the band’s upper edge over its users’ objections. Nothing on the record has started a relocation. A user faces rules that have stayed undecided for more than two years and could be decided at any meeting.
The other shared band moved the other way
The contrast with 6 GHz is sharp. That band, 1,200 MHz from 5.925 to 7.125 GHz, was opened to unlicensed use in April 2020, and every FCC action since has widened that use (Exhibit 5). Very low power devices were allowed anywhere in two of its sub-bands in November 2023 and in the other two in December 2024. Seven automated frequency coordination systems, the databases that set the power of standard-power access points, were approved in February 2024, and the FCC says it has received no interference complaints about them. On 29 January 2026, in FCC 26-1, the Commission created geofenced variable power devices in two sub-bands at up to 24 dBm EIRP, indoors and outdoors, with Commissioners Carr, Gomez and Trusty all approving. The rules took effect on 27 April 2026 (91 FR 9140). The order’s further notice proposes letting the databases count up to 6 dB of building entry loss.
Source: FCC 20-51 (April 2020); FCC fact sheet DOC-417577A1 (8 January 2026); FCC news release of 29 January 2026; Federal Register 2026-03744, 91 FR 9140 (Filed). Note: the FCC says it has received no interference complaints about the AFC systems.
For an enterprise the comparison is direct. One shared band has an open rulemaking, proposals on file to raise its power or move its users, and a statute that leaves it unprotected. The other has the same statutory exposure and six years of decisions, all in one direction. In 2026 the 6 GHz rules are the more settled of the two by some distance.
Renewal and the other obligations inside buildings
The notice proposes no change to PAL renewal, so the test that part 1 dates to 12 March 2031 stands as it is: substantial service, shown from radios registered with a database. Two other rules bear on a building owner, and neither is about CBRS.
- Signal boosters. Under § 90.219 a building owner may run a booster on public-safety or private land mobile frequencies only with “the express consent of the licensee(s)”. A wideband (Class B) installation has to be registered in the FCC’s signal booster database. Only a distributed antenna system inside a building may carry commercial and public-safety bands together.
- FirstNet. FirstNet now brings its own band indoors at public-safety sites. Its FY2025 report records 5,546 units supplied to agencies to extend Band 14 coverage inside, “providing up to approximately 85 million square feet of indoor coverage”. The task order behind them requires AT&T to extend that coverage to public-safety facilities.
Terms used
- Notice of proposed rulemaking. The FCC’s formal proposal to change its rules. It binds nobody until a report and order adopts it.
- Ex parte. A filing that records a meeting or letter with FCC staff about an open proceeding, in the filer’s own words.
- Category C and D. Proposed CBRS radio classes above today’s Category B ceiling of 47 dBm per 10 MHz: 62 dBm and 72 dBm.
- Covered band. The statute’s name for 1.3 to 10.5 GHz less its two excluded ranges, from which the pipeline’s spectrum must come.
- AFC, automated frequency coordination. A database that sets the power a standard-power 6 GHz access point may use at its location, to protect fixed microwave links.
Implications
Enterprise or building owner
Price two more years of undecided rules into any CBRS plan, as Syracuse University has had to. An indoor network on low-power radios gained from the 2024 changes, and it is exactly the kind of network higher power would hurt. If you run one, file in GN Docket 17-258 and file with analysis, because the FCC’s July 2026 order faulted the CBRS users for presenting none.
Carrier strategist
Argue the power case with indoor coverage data rather than radio counts. The statute removed the destination in AT&T’s relocation plan, so the live choices are power and pipeline. The Chairman’s office is already asking whether the band is used, and the 62 dBm case is in substance a building-penetration case, so make it one.
Investor
Hold PAL values under a notice that could change power before 2031, because nothing has been decided. Watch 4 July 2027, when NTIA must identify its first 200 MHz of federal spectrum: that list would show whether 3.55 to 3.65 GHz is in play.
Method and limits
How this was built
The state of the proceeding is read from the FCC’s own documents and from the electronic docket listing of GN 17-258, sorted by date and read to 7 October 2026. Where the text says there is no order, none appears in that listing or among the FCC’s documents. Each party’s position is quoted from its own filing. The statute is read from the enrolled text of section 40002. Power ratios are 10 to the power of the decibel difference divided by ten. A position whose document was not opened is marked as reported.
What it does not show
An ex parte letter summarises a meeting in the filer’s words, and the FCC is bound by none of them. The positions of the Department of Defense and of the ten senators who reportedly wrote in September 2025 are known only from the trade press. Which bands NTIA will identify under the statute is not public. The fire codes that require in-building public-safety radio coverage are adopted locally; their text was not checked and their requirements are not described here.
Data as of: GN Docket 17-258 listing and FCC documents read 7 Oct 2026 · Method version 1.0.
Found an error? Tell us. Corrections are published on the piece that carried them.
If this is on your desk
We need a spectrum position before the auction.
We work this decision through with your team. The first step is a one-day teardown: a 90-minute working session and a written answer two working days later, with the model behind it yours to keep.