Analysis · 6G · part 7 of 8
What would move the dates, and how you would know
A 6G calendar is only as good as the bodies that wrote it, and every one of them can change its mind at the next meeting. We counted twenty dated events between November 2026 and September 2034 that would move the dates in parts 1 to 4. The useful thing about them is that each produces a document on the day, so a slip arrives in writing rather than as a rumour. Four of the twenty carry most of the risk. Three of those four fall within the next thirteen months.
Sources: Every date is carried from part 1, part 2, part 3, part 4 and part 8, with their primary and second sources. No new primary source is introduced.
The timeline has four hinges, and three of them fall within thirteen months
Every date on the list belongs to a body that publishes what happened on it, which makes the watching cheap. Not every date matters equally, though. Four carry most of the risk, because most of what comes later depends on them (Exhibit 1).
The first hinge comes soonest, and it is the one we would least like to miss: the pair of 3GPP plenaries in Boston on 7 to 11 December 2026. RAN#114 has to decide whether any migration path from 5G to 6G beyond spectrum sharing is allowed at all, a question RAN#112 and RAN#113 both left open. In the same week SA#114 receives the architecture decision on the 6G core that the SA plenary has told its working group to reach by November. As if that were not enough for one month, the NTIA’s report on 7.125 to 7.4 GHz, due twelve months after the memorandum of 19 December 2025, lands in December too.
The second is March 2027, when Release 20 is projected to freeze and the Release 21 package is approved, so a slip there is inherited by 6G before 6G has begun. The third is WRC-27 in Shanghai, from 18 October to 12 November 2027, which decides agenda item 1.7 and with it the spectrum. The fourth is the Release 21 Stage 3 freeze in December 2028 at TSGs#122. Counted from 7 October 2026, the four fall at two, five, twelve and twenty-six months. Most of the risk is concentrated in the first year.
Source: 3GPP Release 20 and Release 21 pages and the RAN#113 report; ITU IMT-2030 page and WRC-27 page; NSPM-8 (19 December 2025); FCC DA 26-769; P.L. 119-21 section 40002, as carried in parts 1, 2 and 8 (Compiled). Note: the four emphasised events are the hinges; 3GPP dates are its plan on 7 October 2026.
The twenty dates in order
The full list runs from an ITU-R Study Group 5 meeting at the end of November 2026 to the day the FCC’s auction authority ends, 30 September 2034. For each row we have named the body that owns it, the document it produces and the part of the series whose table would change (Exhibit 2).
| When | What | Where the outcome is published | What it changes |
|---|---|---|---|
| 30 Nov to 1 Dec 2026 | ITU-R Study Group 5 approves the IMT-2030 minimum requirements and evaluation guidelines | SG 5 meeting report; the published Report | Part 3: the draft requirements become the pass mark |
| Dec 2026 | NTIA report on 7.125 to 7.4 GHz, due twelve months after NSPM-8 | NTIA publication | Part 2: the American 7 GHz band gets a federal position, or a longer study |
| 7 to 11 Dec 2026 | RAN#114 and SA#114 decide the 5G-to-6G migration options beyond spectrum sharing, and the direction of the 6G core | 3GPP plenary reports | Part 8: whether 6G is a software upgrade or a hardware cycle; part 4’s next capex |
| Feb 2027 | WP 5D #54: IMT-2030 submission window opens | WP 5D meeting report | Part 1: the ITU clock starts |
| Mar 2027 | Release 20 functional freeze (projected), closing the 6G study; Release 21 package approval and Stage 1 freeze | 3GPP SA#115 and RAN#115 reports | Part 1: a slip here moves Release 21 before it has started |
| 27 Apr 2027 | Auction 115, 160 MHz of upper C-band: bidding opens | FCC auction public notices | Part 4: the price sets the capacity bill |
| 4 Jul 2027 | Two-year statutory marks: 200 MHz identified by the NTIA, 100 MHz auctioned by the FCC | NTIA notice; FCC closing public notice | Part 2: the pipeline is or is not on schedule |
| Mid 2027 | Early Release 21 architecture to WP 5D #55 as information | WP 5D contribution list | Part 1: 3GPP and the ITU-R are aligned, or not |
| 18 Oct to 12 Nov 2027 | WRC-27 decides agenda item 1.7 | WRC-27 Final Acts | Part 2: which of 4.4 to 4.8, 7.125 to 8.4 and 14.8 to 15.35 GHz is identified, and for which regions |
| Early 2028 | Carrier capex guidance following the auction | FY2027 Forms 10-K and fourth-quarter releases | Part 4: whether the 2022 pattern repeats |
| Jun 2028 | Release 21 Stage 2 freeze, after an 80% checkpoint in March | 3GPP plenary reports | Part 1: the architecture is fixed on time, or not |
| Dec 2028 | Release 21 Stage 3 freeze (TSGs#122) | 3GPP plenary reports; a news item if it moves | Parts 1 and 6: every 6G revenue date |
| Feb 2029 | WP 5D #59: submission window closes | WP 5D meeting report | Part 1: the candidate set is fixed |
| Mar 2029 | Release 21 ASN.1 and OpenAPI freeze; first 6G specifications | 3GPP specification numbering | Part 6: the three Release 21 rows get a product clock |
| 4 Jul 2029 | Four-year statutory marks: 500 MHz identified, 200 MHz of it auctioned | NTIA and FCC records | Part 2: the second tranche exists |
| 2029 to 2030 | First commercial 6G systems, on the expectations of Qualcomm, Nokia and Ericsson | Vendor and operator announcements | Part 6: the 6G line starts, or does not |
| Mid 2030 | IMT-2030 specifications, at the latest | Recommendation ITU-R M.[IMT-2030.SPECS] | Part 1: the ITU process completes |
| 31 Dec 2030; 1 Jul 2031 | Upper C-band terrestrial service may begin, top 75 areas then the rest; new devices must cover 3.70 to 4.14 GHz | FCC transition certifications; carrier notices | Part 6: the capacity row earns |
| 4 Jul 2033 | Eight-year statutory mark: the remaining identified federal spectrum auctioned | FCC closing public notices | Part 2: the 7 GHz band, if identified, is sold by here |
| 30 Sep 2034 | Auction authority ends; 300 MHz due | Statute | Part 2: the outer limit of the pipeline |
Bold rows are the four on which the most later rows depend. A date marked projected or planned is 3GPP’s current plan; the statutory and conference dates are fixed by law or treaty.
Source: parts 1 to 4 and 8 of this series, with the sources given there: 3GPP release pages and plenary reports; ITU IMT-2030 and WRC-27 pages; P.L. 119-21 section 40002; NSPM-8; FCC 26-46 and DA 26-769; Forms 10-K (Compiled).
Read down the table and the twenty sort themselves by who owns them. Ten are meetings of 3GPP, the ITU-R or the conference, so the date is the meeting and the outcome is its report or its Final Acts. Seven are deadlines set by statute, by the December 2025 memorandum or by the FCC’s order, and no plenary can move those. That leaves three of a softer kind: the ITU-R’s mid-2030 target, the carriers’ annual guidance and the vendors’ expectation of first commercial systems. The last of those has no body behind it at all.
The timeline moves in three ways, and each way has its own document
Whatever happens on the list, it moves the dates in one of only three ways. The standard can slip, a spectrum decision can go one way or the other, or the carriers can change what they are able to spend. Each has a precedent, a document and a direction (Exhibit 3).
| Mechanism | Event to watch | Document on the day | Direction and precedent |
|---|---|---|---|
| Standards slip | Release 20 freeze, March 2027; Release 21 freeze, December 2028 | 3GPP release page, where projected becomes an actual date; a news item | Later only. Four 5G releases in five moved, by three, six, nine and three months |
| Spectrum decision | NTIA report, December 2026; WRC-27, October to November 2027 | NTIA publication; WRC-27 Final Acts footnote naming regions and countries | Either way. An identification allows an auction by July 2033; no change moves the American 6G band question back to the C-band |
| Carrier spend | FY2027 capex guidance, early 2028, after Auction 115 | Forms 10-K and fourth-quarter releases | The budget, not the date. In 2021 to 2022 spectrum came first and capex peaked the year after, at $56.7 billion |
The 5G base rate is part 1’s; the statutory auction deadline is part 2’s; the capex peak is part 4’s.
Source: 3GPP news items and releases page (part 1); NSPM-8, Resolution 256 and P.L. 119-21 section 40002 (part 2); Forms 10-K FY2019 to FY2025 (part 4) (Compiled).
A standards slip is the likeliest of the three and the easiest to see coming. Part 1 puts the base rate at three to nine months, in one direction only, announced at a plenary with a news item. The event we would watch first is the March 2027 freeze of Release 20, because the 6G study has to close before the normative work can be scoped. A slip there is a slip in Release 21 before anyone has touched Release 21. The test could hardly be easier. The 3GPP release page shows a projected date today; on the day, it should show an actual one.
A spectrum decision is the one move that can go either way, and it arrives in two documents about a year apart. The first is the NTIA’s report on 7.125 to 7.4 GHz, due in December 2026 under the December 2025 memorandum, which either identifies the band for reallocation or explains why it cannot. The second is WRC-27, whose Final Acts say whether 7.125 to 7.4 GHz, or more, or nothing, is identified, and for which regions. An identification is less than it sounds. It does not put American spectrum on sale. It allows the NTIA and the FCC to sell it, under a statute that excludes 7.4 to 8.4 GHz and sets July 2033 as the deadline for the federal spectrum.
Either outcome lands in one row of part 6. If the conference does what the carriers asked for in February 2026 and identifies 7.125 to 7.45 GHz, the 7 GHz row stays at 2030 onward. If it does nothing, the question of an American 6G band goes back to the C-band and the upper C-band, which are 5G bands served by 5G radios.
Carrier spending is the slowest signal and the one with the longest record
The three national carriers file their capital expenditure every year under a tag a machine can read. So the shape of the last cycle is on the record, with no estimate of ours in it (Exhibit 4).
The last cycle had a simple shape. The carriers bought spectrum in 2021, their capex peaked in 2022, and it was back near the base within three years. In money, the three spent $44.0 billion in 2019, $56.7 billion at the 2022 peak, the year after the C-band auction, and $47.8 billion in 2025. The equivalent signal for the next cycle is the FY2027 capex guidance, published in early 2028 once the upper C-band has been bought. If it rises the way 2022 did, the budget for 2028 to 2030 is committed to mid-band capacity on existing radios, right through the Release 21 freeze. The 6G build then has to compete for whatever comes after.
Source: Forms 10-K, FY2019 to FY2025, consolidated statements of cash flows, as tabulated in part 4 (Filed); sums of the unrounded filed values (Calculated). Note: the three carriers bid $78.2 billion in the C-band auction that closed in February 2021; the Sprint merger closed on 1 April 2020.
Two numbers from part 4 give a sense of how much room there is. After capex and dividends, the three carriers had $33.8 billion left between them in FY2025. At the two recent mid-band prices, the 160 MHz on offer in Auction 115 would cost $36.0 billion to $46.4 billion, which is more than the whole of that surplus. The auction closes in 2027, and the FY2027 releases of early 2028 are the first filings that will show what the carriers mean to spend around it.
Each outcome changes one table in one part
Watching the list costs almost nothing, because the bodies that own the dates publish what they did. Someone has to read the document on the day, and when they have, the change is a single edit to a single table (Exhibit 5).
Changes a table in that partNo change
Source: the watch-list in Exhibit 2 and the tables of parts 1, 2, 3, 4, 6 and 8 (Compiled). Note: part 1 is the standards calendar, part 2 the spectrum pipeline, part 3 the capabilities, part 4 the cost of a cycle, part 6 the bets and part 8 the features.
Six kinds of document carry all twenty outcomes between them, and none of them needs an analyst to interpret it.
- A 3GPP release page. It shows the word projected beside a freeze date until the freeze happens, then the actual date. Compare the two on the day.
- A WP 5D meeting report. It lists what was received, so it shows whether the IMT-2030 window opened in February 2027 and closed in February 2029 with 3GPP’s submission inside it.
- A Final Acts footnote. It names the regions and countries that took an identification at WRC-27, and so settles the ranges in part 2.
- An FCC public notice. It closes an auction with a gross total and a list of winners, and so settles the price in part 4.
- An NTIA report. It names a band for reallocation or it does not, and either way it settles the federal position on 7.125 to 7.4 GHz.
- A Form 10-K. It states the coming year’s capex guidance in a sentence, and so shows whether the 2022 pattern repeats.
The edits are just as contained. A migration decision in December 2026 changes part 8’s map and part 4’s cycle. A Release 21 slip changes the dates in parts 1 and 6 and touches nothing else. A WRC-27 outcome changes the ranges in part 2 and the 7 GHz row in part 6, and an auction result changes the price in part 4. The IMT-2030 requirements, once approved, replace the draft figures in part 3. Nothing on the list rewrites the series.
The terms, briefly
- Plenary. A numbered decision meeting of one of 3GPP’s technical specification groups: RAN#114 is the 114th meeting of the radio group, SA#114 the 114th of the architecture group. The plenary approves work items, freezes releases and publishes a report.
- Projected. The word 3GPP’s release page uses for a freeze date it plans and has not reached. The page replaces it with the actual date when the freeze happens.
- WP 5D. Working Party 5D, the ITU-R group that writes the IMT-2030 requirements and receives candidate technologies. Its meetings are numbered; the submission window runs from #54 in February 2027 to #59 in February 2029.
- Final Acts. The treaty text a World Radiocommunication Conference adopts. Its footnotes to the Radio Regulations name the regions and countries that take an identification.
- Identification. What a conference gives a band when it marks it for IMT in the Radio Regulations. It is permission for administrations to use the band for mobile under agreed conditions; it is not an allocation to any carrier and not a sale.
Implications
Carrier strategist
Put the four hinge dates in the board calendar now, with the document each one produces, and re-date the plan on each of them. The first falls in the second week of December 2026, two months away. Between those days leave the plan alone, because nothing else on the list moves a date in it.
Investor
Treat the December 2026 plenaries as the first test of the capex thesis, because they decide whether the next cycle is a software number or a hardware one. A 6G position taken before March 2027 is a position on whether a projected date becomes an actual one, and the base rate says later, by three to nine months.
Vendor
Name these twenty dates in your roadmap and say which row of it moves on each, because a customer who has read the calendar will ask. A date that matches a numbered 3GPP meeting will be believed. A date that runs ahead of one will be read against it.
Method and limits
How this was built
We built the watch-list by going back through parts 1 to 4 and 8 and pulling out every dated event a third party could observe. We then placed them in order, with the document that records each outcome and the part whose table it would change. We call an event a hinge when the most later events depend on it, and there are four. The capex series in Exhibit 4 is the three national carriers’ filed capital expenditure from part 4, summed from the unrounded values. The months to each hinge are counted from 7 October 2026.
What it does not show
A list like this can only hold events that are scheduled, required or published as a plan. It has no room for a new statute, a merger or a vendor leaving the market, and any of those would move the dates as surely as a plenary. Where we give a direction, it is what each outcome would do to the dates in parts 1 to 8, which is a different thing from predicting which outcome will occur. A 3GPP plan is a membership decision that the next plenary can revise, so every date marked projected or planned is the plan as it stood on 7 October 2026.
Data as of: the dates in parts 1 to 4 and 8, as read and checked 2 Oct 2026 · Method version 1.1.
Found an error? Tell us. Corrections are published on the piece that carried them.