
Analysis · Direct-to-device · part 7 of 7
What happens next
Six parts of evidence come down to one question a board will ask: whether SpaceX becomes a mobile carrier or stays a supplement to one. Both readings can be defended from what SpaceX and the carriers have filed and said. What that material does settle is what each path requires, what the carriers have said about it, and which filings would appear first if either were under way. In the first week of October 2026 SpaceX agreed to buy the low band its position lacked and the three carriers signed their joint venture; both are the kind of move the indicators below were written to catch.
Sources: Company releases, FCC orders and filings (including DA 26-471 of 12 May 2026, DA 26-653 of 1 Jul 2026 and DA 26-1078 of 6 Oct 2026), SEC filings, the Grain Management release and SpaceX update of 8 Oct 2026, the carriers’ joint release of 1 Oct 2026, and trade reporting where marked. Retrieved 17 Sep 2026; October items read 12 Oct 2026.
One of six models is live
The six models below are ordered by how real each one is, which differs from how much each is discussed. The ordering is our judgement. For the licensed rows the status comes from FCC orders and the FCC licence file; ET Docket 26-169 supplies the proposed rulemaking, and company statements as reported supply the rest (Exhibit 1).
| Model | Who owns the customer | Status |
|---|---|---|
| Wholesale SCS over a carrier’s spectrum | The carrier | Live and licensed. T-Mobile with Starlink; AT&T and Verizon with AST (part 1) |
| Facilities-based carrier on owned spectrum | The satellite operator | Permitted, stated and now provisioned. FCC tech-neutral waivers, 12 May 2026; SpaceX has said it intends to (part 5); on 8 Oct 2026 it agreed to buy up to 14 MHz of 800 MHz for a terrestrial coverage layer, subject to FCC approval |
| Small cells at customer premises with satellite backhaul | The satellite operator | Described publicly by SpaceX; no filing. Dismissed on the record by T-Mobile |
| MVNO onto an incumbent network | Divided | Publicly declined by each of the three carriers in 2026 |
| Unlicensed direct-to-device | Whoever ships the device | Proposed rulemaking. ET Docket 26-169 |
| Wi-Fi offload as a satellite play | None | Commentary only. No announcement or filing by anyone on the record |
Rows are ordered by how far each model has progressed on the public record.
Source: FCC orders of 26 November 2024, 21 April 2026 and 12 May 2026; FCC market licence file, 13 September 2026; FCC fact sheet for ET Docket 26-169, 16 July 2026 (Filed); Grain Management release and SpaceX update of 8 October 2026; company statements as reported by RCR Wireless, Light Reading, Fierce Network and telecoms.com (Reported).
The MVNO row is the one most often assumed and least supported. Each of the three incumbents has said in public, separately, that it is not offering one to a satellite operator. Those statements come from trade reporting rather than transcripts, and they are three separate refusals rather than one industry position; the effect is the same.
An MVNO is the cheap way into mobile, and none of the three carriers is offering one. The expensive way is the one now on the table.
The remarks attributed to named executives below were made at investor conferences and on earnings calls during 2026 and are taken from Light Reading, Fierce Network, RCR Wireless and telecoms.com. No transcripts have been obtained, so each remark is marked as reported rather than verified.
Reported Executive remarks: SpaceX Q2 update, 5 Aug 2026, as reported by RCR Wireless; T-Mobile’s CFO, Citi Global TMT Conference, September 2026, as reported by Light Reading; AT&T’s CEO, Goldman Sachs Communacopia + Technology Conference, September 2026, as reported by telecoms.com; Verizon’s CEO, Q2 2026 earnings call, 24 July 2026, as reported by Fierce Network. No transcripts obtained; paraphrased where marked.
What each scenario requires
In Scenario A, SpaceX becomes a facilities-based carrier. It has the regulatory permission and, from late 2027, the spectrum. It still needs cell sites and backhaul, handset support for its bands, retail distribution, billing and care, and indoor coverage, the hardest of them. The small-cell idea exists because of that last item. At the SpaceX Q2 update on 5 August 2026 its executives talked about putting “a cellular base station on the gear that holds a Starlink broadband dish” and deploying “little femtocells around the country”, with service “end of next year”; the words are reported by RCR Wireless rather than taken from a transcript. Two months later SpaceX contracted for a second answer to the same item. On 8 October 2026 it agreed to acquire Grain Management’s nationwide 800 MHz portfolio, up to 14 MHz of paired spectrum, and said it will deploy “an advanced terrestrial deployment” on it as a coverage layer that “penetrates through obstacles, such as walls”, with the 2 GHz spectrum carrying capacity and most existing phones already supporting the band (SpaceX update). The agreement covers the low-band position the incumbents said it lacked, with a network of ordinary cell sites to put it on: the expensive route rather than the clever one. The cost of that network is not on any citable record; TD Cowen’s analyst put a national build at upwards of $80 billion in a note of 8 October, as Fierce Network reported, and that figure is neither adopted nor adjusted here. Part 4 has the price of the spectrum, which is a report rather than a filing, and the block’s history.
The small-cell idea is an architectural argument: a subscriber’s existing dish becomes a site, and distributed capex stands in for a low-band spectrum position. It is also the claim the incumbents attack hardest. T-Mobile’s CFO, speaking at the Citi Global TMT Conference in September 2026, said the approach would need on the order of a billion femtocells to match existing outdoor coverage, and that a count like that brings interference and backhaul problems with it. Light Reading reported the remark as a paraphrase rather than a quotation.
In Scenario B, SpaceX stays supplemental. The scenario is coherent and cheaper. The economics from part 2 still hold: the carrier lends spectrum, gains coverage it could not economically build, and bills its own subscriber. It is also the only one of the two that Exhibit 1 records as live and licensed. The scenario’s weakness is its ceiling: the business is capped at a wholesale margin on someone else’s customer, metered through the 5 to 6 MHz service channel that part 3 sets out, and it would leave $19.6 billion of nationwide spectrum running a supplement, an odd use of the asset (Exhibit 2).
| Scenario A: facilities-based carrier | Scenario B: supplemental | |
|---|---|---|
| Spectrum | 65 MHz owned at 1.7 to 2.2 GHz from late 2027, plus up to 14 MHz at 800 MHz contracted on 8 Oct 2026, subject to FCC approval | 10 MHz leased in the PCS G block from T-Mobile |
| Permission | Granted: tech-neutral waivers of 12 May 2026 | Granted: SCS order of 26 November 2024 |
| Customer | SpaceX’s own; a retail brand, number portability, billing and care to build | The carrier’s |
| Sites | Cell sites, backhaul and small cells to build; executives describe femtocells on Starlink dishes | Satellites and gateways, in place |
| Devices | Handset support for AWS-4, the H block and unpaired AWS-3 to certify; band 26, the 800 MHz block, is already in most phones | Ordinary phones, in use |
| Indoor coverage | The hardest requirement; answered on paper by the 800 MHz purchase and a terrestrial deployment, and unbuilt | Not offered; the incumbents’ argument |
| Ceiling | None from the model | A wholesale margin on someone else’s customer through a 5 to 6 MHz channel |
| Status | Permitted and stated; low band contracted; no terrestrial filing found to 12 Oct 2026 | Live and licensed |
Executive remarks are as reported, without transcripts. The requirements are our reading of what each path needs.
Source: FCC orders of 26 November 2024 and 12 May 2026; EchoStar Forms 8-K; FCC market licence file, 13 September 2026 (Filed); Grain Management release and SpaceX update of 8 October 2026; SpaceX Q2 update of 5 August 2026 as reported by RCR Wireless (Reported); requirements assessed by Blue Prysm (Judgement).
Three hinges decide between the scenarios
Three things decide the outcome, and none is settled by an opinion about anyone’s intentions: whether the service works indoors, whether the spectrum position is deep enough to carry a national network, and what the capital and the regulatory clock require.
- Indoor coverage. Every incumbent argument comes back to this. AT&T’s CEO, speaking at the Goldman Sachs Communacopia + Technology Conference in September 2026, framed satellite as solving the last 2% of coverage rather than offering a new way to serve the other 98% (telecoms.com, as reported). Verizon’s CEO, on the Q2 2026 earnings call of 24 July 2026, called terrestrial networks orders of magnitude more efficient than satellite and put the addressable market at single-digit millions of rural homes (Fierce Network, as reported). Both are paraphrases of spoken remarks. SpaceX’s reply came on 8 October in the form of spectrum: low band, with a terrestrial deployment to put it on.
- Spectrum depth. 65 MHz nationwide is a real position, on the order of what a single large carrier deploys in one mid-band layer, and the 800 MHz agreement adds a 7 MHz pair beneath it, a coverage layer rather than a capacity one. Whether 79 MHz is enough depends on the location: the same 65 MHz behaves very differently in a rural county and in Manhattan. Neither has been modelled here, and the question belongs in a capacity model.
- Capital and the clock. Part 6 showed the money arriving from outside the industry, which settles the capital half and leaves the clock. The FCC’s news release of 12 May 2026 describes performance obligations requiring “meaningful, reliable connectivity to the public — whether D2D, terrestrial, or both — within years” and publishes no number. The order itself sets the numbers at paragraph 57. From 30 November 2027 SpaceX has two years to show, in each licence area, a downlink signal-to-noise ratio of 5 dB and service 70% of the time over 90% of the area, four years for 80%, and nine years for 10 dB and 90%, with uplink throughput and spectral-efficiency floors alongside; a licence that misses the final test terminates automatically. The 800 MHz order of 1 July 2026 writes the same three dates and metrics into that band’s satellite pathway. The first test date is 30 November 2029.
The propagation difference behind the indoor argument is real, and it ran the incumbents’ way for as long as everything SpaceX owned lay at 1.7 to 2.2 GHz, which penetrates walls less well than the 700 MHz AST leases (part 3). Link budgets are not modelled here, so the claim is not adjudicated; the frequencies are public and the physical argument is consistent with them. What changed on 8 October is the frequencies. SpaceX is still buying width where walls are a problem, and it has now also contracted for a narrow block where they are not, the kind of band AST rents, and has said that block goes to work on the ground first (Exhibit 3). If SpaceX solves indoor coverage, it will be with terrestrial radios on low band, as the incumbents did.
| Holder | Band | Frequencies | Width | Basis |
|---|---|---|---|---|
| AST SpaceMobile | 700 MHz lower blocks | 704 to 716 and 734 to 746 MHz | 24 MHz | Leased from the incumbent carriers; 1,197 records expiring 9 May 2028 |
| SpaceX | PCS G block | 1910 to 1915 and 1990 to 1995 MHz | 10 MHz | Leased from T-Mobile; 173 records |
| SpaceX | AWS-3 unpaired | 1695 to 1710 MHz | 15 MHz | Contracted from EchoStar; closing expected 30 November 2027 |
| SpaceX | H block | 1915 to 1920 and 1995 to 2000 MHz | 10 MHz | Contracted from EchoStar |
| SpaceX | AWS-4 | 2000 to 2020 and 2180 to 2200 MHz | 40 MHz | Contracted from EchoStar |
| SpaceX | 800 MHz, band 26 | 817 to 824 and 862 to 869 MHz | up to 14 MHz | Contracted from Grain Management on 8 Oct 2026; price undisclosed; FCC consent pending |
| SpaceX, contracted total | Six ranges, 817 to 2200 MHz | 79 MHz | 65 MHz owned from late 2027 at $19.6 billion, plus the 800 MHz block at a reported $8 billion |
The service channel today is 5 to 6 MHz: AST’s 700 MHz blocks are 6 MHz wide and the PCS G block is a single 5 MHz pair. The 800 MHz portfolio holds between 4.85 and 14 MHz by county.
Source: FCC market licence file, snapshot 13 September 2026; EchoStar Forms 8-K of 8 September 2025 and 6 November 2025; FCC orders of 26 November 2024, 21 April 2026 and 1 July 2026 (Filed); Grain Management release of 8 October 2026 (Reported); the Grain price from the Wall Street Journal via Fierce Network (Reported).
The three national carriers answered with a joint venture
On 14 May 2026, two days after the FCC order, AT&T, T-Mobile and Verizon announced a joint venture for satellite direct-to-device (joint release). The release described pooled spectrum, joint investment and common technical specifications, with each company’s existing satellite agreements left in place, and called the venture an agreement in principle. On 1 October 2026 the three said they had entered into a joint venture agreement, named Paul Roth as interim chief executive while a search runs for a permanent one, and put a board of founding-member representatives over it (joint release). The second release repeats the May commitments and adds a promise to work with rural operators. It is still a company announcement rather than a regulatory filing (Exhibit 4). A week later SpaceX agreed to buy the low band.
| Item | Status in the release |
|---|---|
| Pooled spectrum | Stated |
| Joint investment | Stated |
| Common technical specifications | Stated |
| Existing individual satellite agreements | Stated to remain in place |
| Joint venture agreement | Signed, per the release of 1 Oct 2026 |
| Leadership | Named: Paul Roth, interim chief executive; a board of founding-member representatives |
| Name of the venture | Not given |
| Ownership split | Not given |
| Satellite partner | Not named |
| Timeline | Not given |
| Regulatory filing | None found to 12 October 2026 |
The May release described the venture as an agreement in principle; the October release says the agreement has been entered into.
Source: AT&T, T-Mobile and Verizon joint releases of 14 May and 1 October 2026 (Reported); search for a regulatory filing by Blue Prysm to 12 October 2026 (Judgement).
Taken at face value, the release describes three carriers pooling the one asset class that part 4 identified as what an entrant cannot assemble quickly. Whether it changes the market depends on terms that have not been published and on a regulatory review that, on the public record, has not begun. No reading of motive is offered beyond the releases. One thing the second release does not say: between the May announcement and the October signature, the low-band block T-Mobile sold to Grain went to the satellite operator the venture was formed in answer to.
Each scenario would show in public filings before any announcement
None of what follows needs inside information. The indicators are ours, but each is a public filing, registration, certification or disclosure that would have to appear before a strategy could be announced (Exhibit 5).
| Indicator | Scenario | Where it would appear |
|---|---|---|
| Low band is bought | A | A purchase of spectrum below 1 GHz. Seen: Grain to SpaceX, up to 14 MHz at 800 MHz, agreed 8 Oct 2026; the FCC’s consent to the assignment is the next filing |
| Terrestrial build begins | A | FCC licensing and special temporary authority activity for SpaceX at 817 to 824 and 862 to 869 MHz, 1695 to 1710, 2000 to 2020 and 2180 to 2200 MHz; the 800 MHz order’s terrestrial build-out, 33% of population or 25% of geography per licence by 1 Jul 2029, if the satellite pathway is not taken |
| Device support arrives | A | Handset band certifications for the AWS-4, H block and unpaired AWS-3 ranges; band 26 needs none, which is part of what the 800 MHz purchase buys |
| Sites are secured | A | Tower and rooftop lease announcements; antenna structure registrations; small-cell siting applications |
| Retail intent | A | A consumer brand, number portability, and care and billing hiring |
| The lease relationship cools | A | The 173 PCS G-block lease records changing, or not being renewed |
| The partnership renews | B | T-Mobile disclosure after the exclusivity period; continuation of the wholesale arrangement |
| The spectrum stays in orbit | B | No terrestrial filings; the 79 MHz used only for supplemental coverage, and satellite applications for the 800 MHz band filed by 4 Dec 2026 as the Grain order requires |
| The joint venture converts | B | Definitive agreements, a named entity and a regulatory filing for the three-carrier venture. Part seen: the agreement was signed on 1 Oct 2026; the name and the filing are still to come |
Scenario A is SpaceX as a facilities-based carrier; Scenario B is SpaceX as a supplement to the carriers. Two rows have moved since 17 September 2026, and both are marked.
Source: indicators selected by Blue Prysm (Judgement); the lease count and the bands from the FCC market licence file of 13 September 2026; FCC DA 26-653 for the 800 MHz dates (Filed); Grain Management release of 8 October 2026 and the carriers’ release of 1 October 2026 (Reported).
Neither list is a forecast or a scorecard. Each sets out only what would have to become visible in public before either path could be executed.
Two dates bound every negotiation in this market
The EchoStar to SpaceX second closing is expected on or about 30 November 2027, and AST’s 1,197 leases expire on 9 May 2028. Every commercial negotiation in this market falls between those two dates. October added two more. Satellite applications for the 800 MHz band are due by 4 December 2026 under the order that approved Grain’s purchase, and SpaceX’s first performance test on its EchoStar spectrum, the 5 dB and 70% test above, falls on 30 November 2029, with the 800 MHz band’s first test written for the same day. The other dated events in the series lead up to them (Exhibit 6).
Source: FCC news release and order of 12 May 2026 (DA 26-471, paragraph 57); FCC DA 26-653 of 1 July 2026; FCC DA 26-1078 of 6 October 2026; joint carrier releases of 14 May and 1 October 2026; EchoStar Forms 8-K; FCC market licence file, 13 September 2026; FCC auction notices (Filed); Grain Management release of 8 October 2026; executive remarks as reported by Fierce Network and RCR Wireless (Reported). Note: the second closing is expected and has not occurred, and the first performance test is dated from it.
The calendar is the one thing to keep from these seven parts. Everything commercial in this market must be negotiated between the second closing and the lease expiry, the first performance test comes two years after that, and the filings that would reveal either path are public, so an announcement is not needed to know which way it is going. The first of those filings arrived on 8 October 2026.
Terms used
- SCS, supplemental coverage from space. The FCC framework under which a satellite operator serves ordinary phones on spectrum a terrestrial carrier is licensed to use. The live T-Mobile and Starlink service runs under it.
- Facilities-based carrier. An operator that owns its spectrum and network and bills its own subscribers, as distinct from a wholesaler or an MVNO.
- MVNO. A mobile virtual network operator: a brand that sells service on another operator’s network under a wholesale agreement.
- Femtocell. A small, low-power cellular base station for a home or office, connected to the operator through the premises’ own broadband.
- Special temporary authority. Short-term FCC permission to operate a radio before or outside a full licence, and one of the filings a terrestrial build would generate.
- Antenna structure registration. An entry in the FCC’s register of antenna structures. A new registration is a public sign that a site is being built.
- 800 MHz, band 26. The 817 to 824 and 862 to 869 MHz pair SpaceX agreed to buy from Grain Management on 8 October 2026: low band, 7 MHz each way, already supported by most phones. Part 4 has its history and its price.
- Performance test. The metrics the FCC wrote into the EchoStar and Grain orders in place of a terrestrial build-out: downlink signal-to-noise ratio, availability over each licence area, uplink throughput per MHz and spectral efficiency per beam, tested at two, four and nine years.
Implications
Carrier strategist
Build the joint-venture question into your own planning now, whether or not you are in it; the agreement is signed and the terms are not published. If three national carriers pool satellite spectrum, the terms available to everyone else change, and regional operators are not at that table. Read the 800 MHz agreement as what it is: the satellite operator your industry supplies with spectrum has contracted to buy a carrier’s coverage layer, from a carrier, with the regulator’s process behind it.
Investor
Use Exhibit 5 as a diligence checklist. A company that says it will build a terrestrial network and has filed nothing, certified nothing and leased no sites is at the intent stage, whatever the roadmap slide says. Buying the low band moves SpaceX one row down that list; the sites, the certifications and the 4 December filings are the rows that follow, and the price is still a press report.
Vendor
Prepare for both scenarios, because they buy different equipment. Scenario A is small cells, backhaul integration and multi-band devices; Scenario B is payloads and gateways. The bands are public and the same in both. The contracted spectrum is 1695 to 1710, 1915 to 1920, 1995 to 2000, 2000 to 2020 and 2180 to 2200 MHz, 65 MHz in all, with up to 14 MHz at 817 to 824 and 862 to 869 MHz added on 8 October 2026. The leased PCS G block is 1910 to 1915 and 1990 to 1995 MHz. Band 26 radios for the ground are a product that exists; an 800 MHz satellite payload at SpaceX’s altitudes is not yet on any record.
Method and limits
How this was built
Transaction terms, spectrum holdings and financials come from FCC orders, the FCC licence file and SEC filings, as cited through the series. The joint-venture description is limited to what the carriers’ own releases of 14 May and 1 October 2026 say. The 800 MHz agreement comes from Grain Management’s release and SpaceX’s update of 8 October 2026; its price is a press report and is marked as such.
Executive remarks were made at investor conferences and on earnings calls and are taken from trade reporting; no transcripts have been obtained. Where an outlet and a date could not be tied to an exact form of words, the remark is paraphrased rather than quoted.
What it does not show
The two scenarios are analytical constructions and carry no probabilities. Today’s filings and statements support both readings, which is why the observable indicators matter more than any opinion, including ours.
The absence of a regulatory filing does not prove that none exists. Nothing here is investment advice, and no company’s securities are valued or recommended.
Data as of: 17 Sep 2026; October 2026 items read 12 Oct 2026 · Method version 1.0.
Found an error? Tell us. Corrections are published on the piece that carried them.
If this is on your desk
We’re being asked for our satellite plan.
We work this decision through with your team. The first step is a one-day teardown: a 90-minute working session and a written answer two working days later, with the model behind it yours to keep.