
Analysis · Direct-to-device · part 5 of 7
Where the rules get written
Most commentary on direct-to-device still treats as open whether the FCC will let a satellite operator build a terrestrial network. The FCC answered on 12 May 2026, when it approved the EchoStar transfers with waivers that let SpaceX run its spectrum from the ground, from orbit or both. Congress has fixed the auction calendar to 2034, and the first auction in four years cleared at $2.658 per MHz-POP. Three orders in five months have since put dates on SpaceX’s spectrum, and the one that approved the 800 MHz band’s sale to Grain set the process that sold it on to SpaceX.
Sources: FCC releases and orders (DA 26-471 of 12 May 2026, DA 26-653 of 1 Jul 2026, DA 26-1078 of 6 Oct 2026), FCC auction results (retrieved 17 Sep 2026), FCC market licence file (13 Sep 2026), Congressional Research Service, Grain Management release of 8 Oct 2026.
The FCC has already permitted a satellite operator to build a terrestrial network
On 12 May 2026 the FCC’s Wireless Telecommunications Bureau and Space Bureau approved both EchoStar transactions. The order moves about 115 MHz of mid-band spectrum to SpaceX and AT&T, and most of its length is conditions. One sentence in it settles the architecture question the market has been arguing about (Exhibit 1).
The Commission described the two deals as “collectively surpassing $40 billion in deal value” (news release; order in GN Docket No. 25-302, DA 26-471). The parties’ own filings say $19.617 billion for SpaceX and $20.25 billion for AT&T, $39.87 billion between them. The two figures reconcile once the $2.4 billion escrow is added.
The consequential part of the decision is one sentence under the heading Tech-Neutral Innovation. It allows SpaceX to use its new spectrum “flexibly for terrestrial, space-based, and hybrid network architectures”. The permission carries conditions. The Commission attaches what it calls “first-of-its-kind performance obligations”, requiring “meaningful, reliable connectivity to the public — whether D2D, terrestrial, or both — within years”. Neither the permission nor the obligation prefers one architecture over the other.
That symmetry matters. Whoever holds this spectrum decides how to use it, and the test it must pass says nothing about how the signal reaches the handset. In our view the regulatory question is closed: SpaceX may build a terrestrial mobile network on its own spectrum if it chooses. What remains is whether it can afford to and whether the physics allows it.
| Term | What the order says | Who it binds |
|---|---|---|
| Permission | Waivers let SpaceX use the spectrum “flexibly for terrestrial, space-based, and hybrid network architectures” | SpaceX |
| Performance obligation | The release requires “meaningful, reliable connectivity to the public” “within years”, whether direct-to-device, terrestrial or both. The order (paragraph 57) sets the numbers: from 30 Nov 2027, per licence and block, a 5 dB downlink SINR and 70% availability over 90% of the area within two years, 80% within four, and 10 dB and 90% within nine, with uplink throughput of 100, 200 and 300 kbps/MHz and spectral-efficiency floors alongside; a licence that misses the final test terminates automatically | SpaceX |
| Escrow | EchoStar funds a $2.4 billion escrow | EchoStar |
| Build-out | AT&T’s 600 MHz build-out is accelerated | AT&T |
| Boost Mobile | Preserved through a hybrid MVNO arrangement with AT&T | EchoStar and AT&T |
The purchase prices in the parties’ filings are $19.617 billion (SpaceX) and $20.25 billion (AT&T). The Commission’s “surpassing $40 billion” includes the $2.4 billion escrow. The performance metrics replace the terrestrial build-out rules (75% of population for AWS-3 and AWS-H, 70% for AWS-4), which the order waives; missing an interim test brings the final one forward by one year, then two.
Source: FCC news release and order of 12 May 2026, GN Docket No. 25-302, DA 26-471, paragraphs 48 and 57; purchase prices from EchoStar’s Forms 8-K, as read in part 4 (Filed).
The FCC has answered whether a satellite operator may build a terrestrial mobile network on its own spectrum, and the answer is yes. The questions left are financial and physical, and no regulator will settle them.
The rest of the order is conditions on other parties. EchoStar must fund the $2.4 billion escrow, AT&T’s 600 MHz build-out is brought forward, and Boost Mobile survives through a hybrid MVNO arrangement with AT&T. The performance terms deserve a closer look than the release gives them, because the Commission has since used them twice.
The order does not ask SpaceX for a terrestrial build-out. The rules would have required 75% of the population of each licence area to be covered for the AWS-3 and H block licences and 70% for AWS-4; the order waives that in favour of a test a satellite can pass. From 30 November 2027, in each licence area and each block, SpaceX has two years to show a downlink signal-to-noise ratio of 5 dB and service available 70% of the time over 90% of the area, with uplink throughput for the worst-served users of at least 100 kbps per MHz; four years to lift availability to 80% and throughput to 200; and nine years to reach 10 dB, 90% and 300, with spectral-efficiency floors of 300 and then 600 kbps per MHz per beam on the downlink. Missing the first test brings the final one forward by a year, and missing the second by two years more; a licence that fails the final test terminates automatically. The order also notes that the 3GPP standards do not yet support satellite operation in the 1915 to 1920 MHz block, and tells SpaceX to ask for a waiver near the milestone if it needs one.
The 800 MHz order applied the same test to a second band
Seven weeks later the Wireless Telecommunications Bureau used the same template on a band SpaceX did not yet own. On 1 July 2026 it approved T-Mobile’s sale of its 800 MHz licences, the 817 to 824 and 862 to 869 MHz pair, to affiliates of Grain Management, and Grain’s sale of 600 MHz licences back to T-Mobile (DA 26-653, WT Docket 25-178). This is the band the Sprint merger judgment had ordered T-Mobile to sell, which DISH declined to buy and which drew no qualifying bid at auction in 2024; part 4 has that history and the prices. Grain had come to the Commission in 2025 describing utilities and regional operators as its customers, and in March 2026 it changed its plan to satellite direct-to-device. The Bureau allowed the change on conditions. Grain had to appoint a neutral adviser and open a competitive process for a satellite partner by 7 August 2026, finish it and report the outcome by 5 November, and have complete satellite applications filed by 4 December. If it did, the satellite metrics of the EchoStar order apply to the band on the same three dates: 30 November 2029, 2031 and 2036. If it did not, a terrestrial build-out applies instead: 33% of the population or 25% of the geography of each licence by 1 July 2029 and 66% or 50% by 1 July 2034, with automatic termination behind it. Because the 800 MHz band is not allocated for supplemental coverage from space, the Bureau also deferred every waiver the band needs for satellite use until the partner was named (Exhibit 2).
The partner was named on 8 October 2026, when Grain announced a definitive agreement to sell the whole portfolio to SpaceX, subject to the Commission’s consent, and said in its release that the agreement aligns with the July order’s process (Grain release). The bids and the other participants are not public; Bloomberg had reported AST SpaceMobile’s interest in August, and that report is unverified. On the record, the regulator wrote a satellite performance test for one operator’s spectrum in May, wrote the same test into a second band in July and required that band’s holder to find a satellite operator to meet it, and the operator found was the one already holding the first band. Two days before the Grain announcement the Space Bureau and the Wireless Bureau had authorised that operator’s next constellation: 15,000 direct-to-device satellites in nine shells between 326 and 335 km, half of them due in orbit by 7 October 2032 and all by 7 October 2035, with the 2000 to 2020 MHz band turned to downlink use by waiver so that both 2 GHz blocks point the same way, the 2020 to 2025 MHz uplink request deferred, and the out-of-band power question of 2024 settled (DA 26-1078; part 3). The 800 MHz band is not among that constellation’s frequencies. Serving it from orbit will take an application the Grain order expects by 4 December.
| Order | What it covers | The dates it fixes |
|---|---|---|
| DA 26-471, 12 May 2026 | EchoStar’s AWS-4, H block and unpaired AWS-3 licences to SpaceX; tech-neutral waivers | Second closing on or about 30 Nov 2027; performance tests at 2, 4 and 9 years from it: 30 Nov 2029, 2031 and 2036; automatic termination for a licence that fails the final test |
| DA 26-653, 1 Jul 2026 | T-Mobile’s 800 MHz licences to Grain; Grain’s 600 MHz to T-Mobile; a conditional path to satellite use | Adviser and competitive process by 7 Aug 2026; outcome reported by 5 Nov 2026; satellite applications by 4 Dec 2026; then the same tests on 30 Nov 2029, 2031 and 2036, or a terrestrial build-out by 1 Jul 2029 and 1 Jul 2034 |
| DA 26-1078, 6 Oct 2026 | SpaceX’s 15,000-satellite direct-to-device constellation at 326 to 335 km; 2 GHz, H block, AWS-3 and PCS G operations inside the US | Half the constellation in orbit by 7 Oct 2032, all of it by 7 Oct 2035; a 15-year term; operations in the EchoStar bands only after the second closing |
The Grain agreement of 8 October 2026 is a company announcement subject to the Commission’s consent; the consent, when it comes, will be a fourth order.
Source: FCC DA 26-471 (GN Docket 25-302), paragraphs 12 and 57; FCC DA 26-653 (WT Docket 25-178), paragraphs 6, 11 and 48; FCC DA 26-1078 (GN Docket 25-340), grant conditions 1, 3 and 9 (Filed); Grain Management release of 8 October 2026 (Reported).
The regulator now writes a satellite performance test rather than a build-out, and it has written the same one twice. Whoever holds the 800 MHz band and the EchoStar bands answers to one calendar, and its first date is 30 November 2029.
Congress had settled a year earlier where the next tranche of spectrum comes from.
Congress has restored auction authority to 2034 and ordered an 800 MHz pipeline
Congress restored the FCC’s auction authority in the reconciliation act signed on 4 July 2025, and this time it runs to 30 September 2034. The statute also attaches a pipeline of at least 800 MHz, including at least 100 MHz of upper C-band at 3.98 to 4.2 GHz that must be auctioned by July 2027. The FCC’s own auction release credits the statute for both the authority and the pipeline. The enacted text, section 40002, and its six deadlines are set out clause by clause in part 2 of the 6G series.
The first auction under the restored authority followed within a year, and it was the first of any kind in four years. Auction 113 opened on 2 June 2026 with AWS-3 spectrum at 1695 to 1710, 1755 to 1780 and 2155 to 2180 MHz. The 200 licences on offer were the ones left over after the 2014 defaults, and the proceeds go to the “rip and replace” reimbursement programme (FCC, 2 June 2026). The next sale is Auction 115, which opens on 27 April 2027 with 160 MHz of upper C-band (Exhibit 3).
Source: FCC Auction 113 release of 2 June 2026 for the statute; FCC news release and order of 12 May 2026; FCC DA 26-653 of 1 July 2026; FCC fact sheet of 16 July 2026; FCC DA 26-1078 of 6 October 2026; FCC market licence file of 13 September 2026; EchoStar Forms 8-K (Filed); Grain Management release of 8 October 2026; election date and seat counts from published election trackers (Reported). Note: AT&T’s leg of the EchoStar sale closed on 28 July 2026.
Auction 113 cleared at $2.658 per MHz-POP
The opening release framed Auction 113 as housekeeping: leftover licences, with proceeds to a reimbursement fund. The results read differently. The 200 licences sold for $3,572,889,200 in gross winning bids across 1,344,395,555 MHz-POPs, which works out at $2.658 per MHz-POP (our calculation). Verizon, bidding as Cellco Partnership, paid $3,162,445,000 for 82 licences, 88.5% of the total (Exhibit 4).
Source: FCC Auction 113 results-by-licence file, retrieved 17 September 2026 (Filed). Note: gross winning bids in $ millions, with the licence count per bidder.
Two things stand out. The first is the concentration: no other bidder came near Verizon’s $3.16 billion, and T-Mobile, which took more licences than Verizon at 102, paid $277.8 million for them. The second is that SpaceX bid at all. Until June 2026 the company appeared in the American terrestrial record only as a tenant. Its two licences cost $8,490,200, or $0.367 per MHz-POP, the lowest price paid in the auction (Exhibit 5).
| Bidder | Licences | Gross winning bids | MHz-POPs | $ per MHz-POP |
|---|---|---|---|---|
| All winners | 200 | $3,572,889,200 | 1,344,395,555 | $2.658 |
| Cellco Partnership (Verizon) | 82 | $3,162,445,000 | 1,060,336,820 | $2.982 |
| T-Mobile License LLC | 102 | $277,787,000 | 213,779,840 | $1.299 |
| AT&T Spectrum Holdings II | 10 | $120,774,000 | 39,274,580 | $3.075 |
| Space Exploration Holdings | 2 | $8,490,200 | 23,151,210 | $0.367 |
Gross winning bids as published by the FCC. MHz-POPs and dollars per MHz-POP are our calculation from block bandwidths and market populations, and the total reconciles with the Commission’s “over 1.4 billion MHz-POPs”.
Source: FCC Auction 113 results-by-licence file, retrieved 17 September 2026 (Filed); dollars per MHz-POP calculated by Blue Prysm (Calculated).
One caveat governs every use of that clearing price. Auction 113 sold a leftover inventory concentrated in dense markets, so its $2.658 per MHz-POP cannot usefully be set beside a nationwide price such as the C-band’s $0.852 or the $0.887 SpaceX agreed with EchoStar. A fair comparison would need a population-weighted match market by market, which this part does not attempt. What the figure does show is that in 2026 a national carrier paid about $3 per MHz-POP for mid-band capacity in the markets it wanted, and that price belongs beside the C-band figure whenever the latter is quoted as the benchmark.
The midterm election cannot reach the permissions already granted
The mechanics of the Commission are widely misdescribed. The Congressional Research Service’s standing account of the agency (CRS R45699) sets them out, and they are simpler than the commentary suggests. There are five Commissioners on staggered five-year terms, and no more than three may come from one party. The President designates the Chair from among the sitting Commissioners on the first day of an administration, without a separate Senate vote. A Commissioner whose term has expired may stay on as a holdover, and three Commissioners make a quorum. None of those rules turns on an election.
The membership does change, though not on election night. A nomination to one of the Commission’s vacant seats was announced in August 2026 and had not been confirmed when Axios reported it on 10 August (Axios, 10 Aug 2026). An August report does not give the seat count in September.
Election day is 3 November 2026. All 435 House seats are contested, as are 35 in the Senate (33 regular Class 2 seats and two specials), by the count of the published election trackers. None of that changes who sits on the FCC, because the terms and the appointment mechanism run on their own statutory calendar. The result can change five other things.
- Committee chairs. Who chairs Senate Commerce and House Energy & Commerce.
- Confirmations. How willing the Senate is to confirm nominees to the two vacant seats.
- Appropriations. The agency’s budget.
- Legislation. Whether any spectrum legislation gets beyond the 2025 act.
- Oversight. How hard Congress looks at NTIA and BEAD.
Those levers act on the pace of policy; the permissions already granted are out of their reach. We know of no scheduled proceeding that would reopen the core direct-to-device permissions before 2028. The SCS framework in GN Docket 23-65 is adopted, the EchoStar transfers are approved and the auction pipeline is written into statute. The FCC’s composition turns over with the presidency, and the next presidential election is in November 2028, the period in which SpaceX’s performance obligations and AST’s leases also come due. The dates coincide; this part does not forecast from them.
No scheduled proceeding reopens the core direct-to-device permissions before 2028. The election can change committee chairs, confirmations and the pace of legislation. It cannot touch the waivers, the SCS framework or the statutory pipeline.
A proposed unlicensed regime would need no spectrum position at all
Separately, and with far less attention, the Commission circulated a Notice of Proposed Rulemaking for its open meeting of 6 August 2026. ET Docket No. 26-169, Unleashing Unlicensed Spectrum for Direct-to-Device, is described in the fact sheet the Commission published on 16 July 2026. The proposal would let a device transmit to a satellite from three unlicensed bands at ordinary Part 15 power of up to 36 dBm EIRP, more than 225 MHz in all (Exhibit 6). The notice also asks whether power flux-density, out-of-band and aggregate limits should apply when several satellite operators share a band.
Source: FCC fact sheet for ET Docket No. 26-169, 16 July 2026 (Filed); widths calculated by Blue Prysm from the band edges (Calculated). Note: the proposal covers more than 225 MHz; the band edges give 234.5 MHz. Proposed power limits are Part 15 levels of up to 36 dBm EIRP.
If the proposal becomes a rule, a class of direct-to-device service arrives that needs neither an auction nor a lease. Nothing in the proposal suggests it could carry voice. It may carry the sensor and asset traffic on which several business cases in this market depend, which is why a proceeding about unlicensed bands belongs in a strategic model that otherwise tracks only licensed ones.
The same notice records why the Commission is interested. By its own count, more than $40 billion has moved through the US space economy for direct-to-device in eighteen months. It cites SpaceX’s $19.6 billion EchoStar purchase, AST’s $550 million L-band agreement, and Amazon’s acquisition of Globalstar and Rocket Lab’s of Iridium as “collectively totaling nearly $20 billion”. Those are the transactions the earlier parts cover from the commercial side. The notice remains a circulated draft and its technical limits are proposals; it is a signal of direction and nothing firmer.
The six factors in a PESTLE frame
Exhibit 7 puts the findings of the series into a PESTLE frame, one factor per row, with the document, docket or dataset each rests on.
| The factor | The checkable fact behind it | |
|---|---|---|
| P | Regulatory permission has been granted | Tech-neutral waivers, 12 May 2026; SCS framework, GN Docket 23-65; the 800 MHz satellite pathway of 1 Jul 2026 and the D2D constellation grant of 6 Oct 2026 |
| E | Spectrum is repricing upward | Auction 113 at $2.658 per MHz-POP; a mandated 800 MHz pipeline to 2034 |
| S | The market served is rural and marginal | Coverage-gap framing in every FCC release; T-Mobile has put satellite at 0.0002 to 0.0003% of its network usage (trade reporting, September 2026) |
| T | Channel width and power limits bind before policy does | 5 to 6 MHz service channels; PFD limits (part 3) |
| L | Satellite performance tests are the new enforcement lever | DA 26-471 paragraph 57 and DA 26-653 paragraph 48: 5 dB and 70% availability by 30 Nov 2029, 10 dB and 90% by 2036, automatic termination behind them; AT&T’s accelerated 600 MHz build |
| E | Orbital rules are being modernised rather than tightened | GSO/NGSO sharing Report and Order, SB Docket 25-157, adopted 30 April 2026 |
The T-Mobile network-usage figure comes from trade reporting of September 2026; no transcript has been obtained. Every other entry points to an FCC document, a docket number or a figure in the earlier parts.
Source: FCC orders, releases and dockets as named; FCC Auction 113 results (Filed); trade reporting for the T-Mobile figure (Reported). Note: the second E is environmental, read here as the orbital regime.
Terms used
- MHz-POP. One megahertz of spectrum covering one person. Dividing a price by the MHz-POPs it buys puts auctions and private sales of very different sizes on one scale.
- SCS, supplemental coverage from space. The FCC’s framework, adopted in GN Docket 23-65, under which a satellite operator may serve ordinary phones on spectrum that a terrestrial carrier is licensed to use.
- PFD, power flux-density. The power a satellite’s signal delivers per square metre at the ground. The FCC limits it to protect terrestrial users of the same and adjacent bands.
- NPRM. A Notice of Proposed Rulemaking: the FCC’s draft rules and questions, published for comment before any rule is adopted.
- Part 15. The FCC’s rules for unlicensed devices, which set power limits such as the 36 dBm EIRP proposed in ET Docket 26-169.
- SINR. Signal to interference plus noise ratio, in decibels: how far a wanted signal stands above everything else at the receiver. The FCC’s satellite tests ask for 5 dB on the downlink to begin with and 10 dB by the final test.
- The 800 MHz band. Here, the 817 to 824 and 862 to 869 MHz pair that T-Mobile sold to Grain and Grain has agreed to sell to SpaceX. The 800 MHz of bandwidth the 2025 statute orders auctioned is a quantity rather than a band.
Implications
Carrier strategist
Stop treating “will the FCC let them?” as the risk; the waivers of 12 May 2026 answered it. Your regulatory exposure now runs through performance tests with dates on them, the auction cadence, and whether unlicensed direct-to-device takes the low end of your IoT business. Model those three and stop modelling the permission. Note also what the 800 MHz order did: when a licensee changed its plan from utilities to satellite, the Bureau wrote a process rather than refusing, and the process delivered the band to SpaceX in fourteen weeks.
Investor
Put two dates in any model. The first is July 2027, by which at least 100 MHz of upper C-band must have been auctioned; Auction 115 opens on 27 April 2027 with 160 MHz. The second is 30 November 2029, the first performance test on SpaceX’s EchoStar bands and, if the satellite path is taken, on the 800 MHz band too; whichever Commission exists at the time will have to enforce it, and 4 December 2026 is the date by which the 800 MHz applications have to be on file.
Vendor
Read ET Docket 26-169 before anything else. An unlicensed direct-to-device regime changes which radios matter and which certification path a device takes, and its proposed limit of 36 dBm EIRP is a design number you can start from today.
Method and limits
How this was built
The FCC’s orders, releases and auction results file are read directly rather than through summaries of them. The agency’s constitution is taken from the Congressional Research Service.
The dollars per MHz-POP for Auction 113 are Blue Prysm’s calculation. Each licence’s block bandwidth is multiplied by the population in the FCC’s market table (A1 5 MHz, B1 10 MHz, G, H and I 10 MHz, J 20 MHz) and the gross winning bids are divided by the total. The result reconciles with the Commission’s own figure of “over 1.4 billion MHz-POPs”.
What it does not show
The FCC’s membership changes without notice, so the seat count should be checked on the day it is relied on. ET Docket 26-169 is a circulated draft, and its technical limits are proposals rather than rules.
Nothing here predicts an election result or forecasts what a regulator will do. Auction 113’s price per MHz-POP reflects a leftover inventory concentrated in dense markets; it is not a nationwide benchmark and is not used as one.
Data as of: FCC auction results and licences 13 to 17 Sep 2026 · orders as dated, read 12 Oct 2026 · Method version 1.0.
Found an error? Tell us. Corrections are published on the piece that carried them.
If this is on your desk
We’re being asked for our satellite plan.
We work this decision through with your team. The first step is a one-day teardown: a 90-minute working session and a written answer two working days later, with the model behind it yours to keep.