
Analysis · Direct-to-device · part 2 of 7
Why the operators are doing this
The filings explain the deployments in part 1. AST SpaceMobile spent $1,064.7 million on capital in FY2025, fifteen times its revenue, while Iridium, the incumbent, made $114.4 million of net income on $871.7 million. A company spending at AST’s rate cannot afford to buy spectrum, so it rents, and the tenancy has an end date: every one of its 1,197 lease authorisations expires on 9 May 2028.
Sources: SEC XBRL company facts (retrieved 17 Sep 2026), FCC authorisation orders, FCC licence database (13 Sep 2026), Grain Management release of 8 Oct 2026.
The three companies in the table are three different kinds of business
Every figure in Exhibit 1 is from an SEC filing, tagged and dated; none is from an investor presentation. The three companies compared are satellite operators whose filings cover their satellite business on its own. SpaceX has filed since June 2026 but reports its phone service inside a larger segment, which is covered below.
| AST SpaceMobile | Globalstar | Iridium | |
|---|---|---|---|
| Revenue, FY2025 | $70.9M (from $4.4M in FY2024) | $273.0M | $871.7M |
| Revenue, H1 2026 | $46.0M | $134.8M | $444.3M |
| Net income, FY2025 | −$341.9M | −$8.7M | +$114.4M |
| Capex, FY2025 | $1,064.7M | $5.5M (see note) | $100.3M |
| Capex, H1 2026 | $859.2M | n/a | n/a |
| Operating cash flow, FY2025 | −$72M | $622M | $400M |
| Operating cash flow, H1 2026 | −$145M | $160M | $186M |
| Cash, FY2025 | $2,335.7M | $447.5M | $96.5M |
| Cash, 30 Jun 2026 | $2,288M | $410M | $184M |
| Long-term debt | $2,963M | $307M | $1,757M (31 Dec 2025) |
| R&D, FY2025 | $28.1M | $6.1M | $19.8M |
Globalstar tags only PaymentsToAcquireOtherPropertyPlantAndEquipment, so its capex is not comparable with the other two columns. Its FY2025 net cash used in investing activities was $550.4M, the better proxy for what it spends (see part 6). Iridium’s long-term debt is as reported at 31 December 2025, because its Q2 2026 filing does not tag the same line. Rounded figures are as tabulated in part 6.
Source: SEC XBRL company facts (data.sec.gov), retrieved 17 September 2026; revenue, capital expenditure, operating cash flow, cash, debt, R&D and net income read from each company’s FY2025 Form 10-K and Q2 2026 Form 10-Q tags (Filed). Note: fiscal years as filed. AST’s FY2025 revenue is the amount in its FY2025 Form 10-K.
The three columns are not three stages of one company. Iridium is a profitable incumbent, with $871.7M of revenue in FY2025, the only positive net income in the table and a mature constellation maintained on $100.3M a year of capital expenditure. Globalstar is a wholesale business of a different kind, with $273.0M of revenue, a net loss of $8.7M, research spending of $6.1M and spectrum it owns rather than rents. AST SpaceMobile is a construction project. It spent $1,064.7M in FY2025 against $70.9M of revenue, funded from cash of $2,335.7M, which works out at a little over two years of spending at that rate.
Cash from operations makes the same point. Iridium generated $400M from operations in FY2025 and Globalstar $622M, so both pay their own way. AST ran an outflow of $72M in the year and $145M in the first half of 2026. Its cash fell from $2,335.7M to $2,288M over that half, and it carried $2,963M of long-term debt at 30 June 2026. Two of these businesses fund themselves; the third draws on money it has raised.
AST’s capital spending rose sixfold in a year
Capital expenditure is the fastest-moving line in AST’s accounts: $174.1M in FY2024, six times that at $1,064.7M in FY2025, and $859.2M in the first half of 2026 (Exhibit 2). Revenue for the same periods was $4.4M, $70.9M and $46.0M. The company is in the middle of a build, and the build is the strategy rather than a preliminary to it.
Capital expenditureRevenue
Source: SEC XBRL company facts, retrieved 17 September 2026; fiscal years as filed (Filed). Note: $ millions. H1 2026 is six months.
The rest of AST’s column follows from that. A net loss of $341.9M is what construction on this scale produces. The $28.1M of research spending looks small only beside the hardware spend. The $2,335.7M of cash matters chiefly as a measure of how long the build can continue at the current rate; margin is a question for the day construction stops.
The three companies therefore deserve different questions. For Iridium and Globalstar, which are being run, the questions are margin, retention and renewal. For AST, which is being built, they are how much is left to build and who pays for it.
SpaceX’s filings do not separate its phone business
The largest constellation in the market is missing from Exhibit 1 even though SpaceX is now a public filer. It filed a Form S-1 on 20 May 2026, a prospectus on 12 June 2026 and its first Form 10-Q, for the quarter to 30 June 2026, on 4 August 2026. The 10-Q details the Connectivity segment, which had $4,291M of revenue, $1,656M of income from operations and $1,367M of capital expenditure in the quarter, and shows $93,522M of cash and cash equivalents at 30 June for the group as a whole. Starlink Mobile revenue, however, is reported inside the segment’s Enterprise & Government line of $1,806M, alongside aviation, maritime and government work, and nothing in the filing separates it out (Exhibit 3).
| Measure | Figure | Where it is reported |
|---|---|---|
| Connectivity revenue, Q2 2026 | $4,291M | Segment note, Form 10-Q filed 4 Aug 2026 |
| Of which Enterprise & Government | $1,806M | Revenue note; a footnote says the line “includes revenue from Starlink Mobile service offerings” |
| Connectivity income from operations, Q2 2026 | $1,656M | Segment note |
| Connectivity capital expenditure, Q2 2026 | $1,367M | Segment note; for the segment, not the phone service |
| Cash and cash equivalents, 30 Jun 2026 | $93,522M | Balance sheet, for the group |
| V1 Mobile satellites | about 650 | Prospectus, 12 Jun 2026 |
| Monthly unique devices served | about 7.4 million, in about 30 countries | Prospectus, 12 Jun 2026 |
| Direct-to-cell revenue or capital expenditure | Not broken out | No line in the 10-Q or the prospectus |
The prospectus says approximately 650 V1 Mobile satellites provide satellite-to-mobile data, over-the-top voice and messaging to approximately 7.4 million monthly unique devices across approximately 30 countries.
Source: SpaceX Form 10-Q for the quarter to 30 June 2026, filed 4 August 2026; prospectus (Form 424B4), 12 June 2026 (Filed).
We have not filled the blank with an estimate. It would be the only unfiled number in an argument built on filings, and it would be the number everyone quoted. In our view a market model that treats all four operators as equally knowable is wrong at the foundation; a sound one has three measured companies and one blank, and says so.
Renting is the only route the capital expenditure line leaves open
Part 1 showed that AST and SpaceX hold leases rather than licences, so neither owns the spectrum its consumer service depends on. On its own that looks like a weakness; against the capital expenditure line it looks like the only route open. We see three reasons the arrangement holds, all of them financial.
- Crowding out. A company spending a billion dollars a year on hardware cannot also buy the band it flies on. Buying AST’s 24 MHz nationwide would cost roughly $5.4B to $7.2B at the prices in part 4, which is two to three times its cash. A lease keeps the capital in the constellation, where the business needs it.
- Optionality. A lease can be exited and a licence purchase cannot. For a service that has not yet proved consumer demand, reversibility has value: renting turns an irreversible bet on a market into a recurring cost that can be stopped.
- The carrier’s side. The carrier lends spectrum it already owns, gains coverage it could not build economically, and keeps billing its own subscriber. The satellite operator gains reach without winning customers one at a time. Each side supplies the part of the business it is better placed to supply, which makes the arrangements wholesale rather than retail (Exhibit 4).
| Carrier | Satellite operator | |
|---|---|---|
| Supplies | Licensed spectrum, lent under a lease; the subscriber relationship and the bill | Satellites, launch and coverage where a tower is uneconomic |
| Gets | Coverage it cannot economically build | Reach without acquiring customers one at a time |
| Keeps | The licence, the customer and the pricing | The constellation and its operating cost |
| Depends on | A satellite operator that can fund a fleet before revenue arrives | A partner who owns both the spectrum and the customer relationship, and who sets the terms at renewal |
| On the record | AT&T, Verizon and FirstNet with AST (order of 21 Apr 2026); T-Mobile with SpaceX (order of 26 Nov 2024) | AST: 1,197 leases to 9 May 2028. SpaceX: 173 leases in the PCS G block |
The division of roles is our reading of the arrangements the FCC orders describe.
Source: FCC DA 26-391 (21 April 2026) and DA 24-1193 (26 November 2024); FCC market licence file, snapshot 13 September 2026 (Filed); roles as read by Blue Prysm (Judgement).
The arrangement has a built-in constraint: the satellite operator’s revenue depends on a partner who owns both the spectrum and the customer. Globalstar shows the same logic from the other end. It owns its spectrum outright and still earns most of its revenue wholesaling capacity to one large consumer partner rather than selling retail, so its accounts show substantial revenue and almost no margin. Owning the spectrum removes the landlord; it does nothing about who owns the customer. Both incumbents have since agreed to be bought. Amazon’s agreement of 13 April 2026 pays Globalstar holders $90.00 a share in cash or 0.3210 Amazon shares. Rocket Lab’s agreement of 28 June 2026 pays Iridium holders $27.00 in cash plus Rocket Lab stock at a ratio of 0.2400 to 0.4000. Part 6 sets out the terms and who is paying.
The tenancy comes up for renewal on one day in May 2028
The dates are exact. All 1,197 of AST’s lease authorisations were granted on 21 April 2026, and every one expires on 9 May 2028 (Exhibit 5). A footprint assembled in a single administrative act comes up for renewal in a single administrative act, so the whole American business rests on one calendar entry.
Source: FCC market licence file, snapshot 13 September 2026; FCC DA 26-391 (21 April 2026); FCC news release of 12 May 2026; EchoStar SEC filings for the closing expectation (Filed); Grain Management release of 8 October 2026 (Reported).
Whatever is built on that footprint has about two years to prove itself before the commercial terms are renegotiated. The counterparties at that table are the carriers whose customers the service serves.
The other tenant is buying its way out. SpaceX expects to own 65 MHz from late 2027, and on 8 October 2026 it agreed to buy a second block, up to 14 MHz of paired 800 MHz spectrum from Grain Management, at a price neither party has stated. The capital constraint that keeps AST renting does not bind SpaceX, which held $93.5 billion of cash on 30 June 2026. Part 4 sets out both purchases and part 6 the balance sheets behind them.
Anyone modelling this business should treat the date as an input rather than a footnote. It bounds the window in which evidence on usage, pricing and retention has to be produced, and anything meant to improve the renewal terms has to exist before it. The alternative is to stop being a tenant, which has a price of its own; part 4 works out what owning the spectrum would cost.
Terms used
- Capital expenditure (capex). Cash paid for property and equipment in the period, as each company tags it in its filings. It is not the same as constellation cost, and the tags differ between filers.
- XBRL company facts. The machine-readable tags behind every SEC filing, published at data.sec.gov. Reading them gives the filed number rather than a summary of it.
- Wholesale. Selling capacity to another company, which sells the service to its own customers under its own brand and bill. Retail sells to the end customer directly.
- Lease authorisation. The FCC record permitting one company to use another’s licensed spectrum for a stated term. AST’s 1,197 are its entire American footprint.
- Runway. Months of cash at the current rate of spending before new financing is needed. We calculate it from the filed half-year figures rather than from guidance.
Implications
Carrier strategist
Settle your position at renewal before the 2028 cycle, because during it will be too late. Under the wholesale model your subscribers’ satellite experience is priced and controlled by an arrangement between two other companies, and AST’s 1,197 authorisations expire on 9 May 2028. The terms you hold on that day will be whatever you have agreed before it.
Investor
Ask three questions before diligence starts, and expect a filed answer to each. Does the company own or rent its spectrum? Is capital spending running ahead of revenue, and for how many quarters does the cash cover it? Is the business retail or wholesale? For AST the filings answer rent, yes with about fourteen months of cash, and wholesale. A wholesale business grows only as fast as its partner’s incentives allow, whatever its own execution.
Vendor
Sell into a build and into an operation on different terms, because they buy differently. AST’s $1,064.7M of FY2025 capital spending is where the equipment money is, concentrated in a build phase with a horizon everyone can see in May 2028. Iridium’s $100.3M is what steady state looks like, a mature constellation being kept up.
Method and limits
How this was built
Every financial figure here comes from SEC XBRL company facts at data.sec.gov, read from each company’s filed tags rather than from a summary of them. Revenue, capital expenditure, cash, R&D and net income are taken from the 10-K and 10-Q filings, with fiscal years as filed. AST tags its revenue inconsistently across periods, so for FY2025 the amount in its FY2025 Form 10-K is used. SpaceX’s figures are from its Form 10-Q for the quarter to 30 June 2026 and its prospectus of 12 June 2026. The runway estimate is our calculation: cash at 30 June 2026 divided by the half-year outflow on capital and operations.
What it does not show
SpaceX files with the SEC but reports its satellite-to-phone service inside the Enterprise & Government line of its Connectivity segment, so no figure comparable to the three companies in Exhibit 1 exists. Capital expenditure here is cash paid for property and equipment, which is not the same as constellation cost, and Globalstar does not tag constellation spending as capital expenditure at all. The runway figure is arithmetic on filed numbers and assumes the current rate of spending continues. This is not investment advice and does not forecast whether any of these companies will succeed.
Data as of: SEC filings retrieved 17 Sep 2026 · Method version 1.0.
Found an error? Tell us. Corrections are published on the piece that carried them.
If this is on your desk
We’re being asked for our satellite plan.
We work this decision through with your team. The first step is a one-day teardown: a 90-minute working session and a written answer two working days later, with the model behind it yours to keep.